SAMAD, M. A.; ABDULLAH, J. .; RIFAT, M. A. H. . Reduction of Manufacturing Lead Time by Value Stream Mapping of a Selected RMG Factory in Bangladesh. Asian Journal of Engineering and Applied Technology, [S. l.], v. 12, n. 1, p. 10–17, 2023. DOI: 10.51983/ajeat-2023.12.1.3578. Disponível em: https://ojs.trp.org.in/index.php/ajeat/article/view/3578. Acesso em: 22 dec. 2024.