Effects of Risk Management on Project Performance

Authors

  • S. Senthamil Prabu PG Student, Department of Civil Engineering, RVS Faculty of Engineering, Coimbatore, Tamil Nadu, India
  • C. Krishna Assistant Professor, Department of Civil Engineering, RVS Faculty of Engineering, Coimbatore, Tamil Nadu, India

DOI:

https://doi.org/10.51983/tarce-2017.6.2.2236

Keywords:

Risk Management, Project Performance

Abstract

Risks are very common in construction sector. Risk is the Possibility of suffering loss and the impact on the involved parties. All projects are inherently risky because they are unique, constrained, complex, based on assumptions, and performed by people. As a result, project risk management methods must be built into the management of projects and should be used throughout the project lifecycle. Many construction projects fail because organizations assume that all the projects would succeed and they therefore do not identify, analyze, and provide mitigation or contingencies for the risk elements involved in the project. Society desires that all projects should be performing and has become less tolerant of failure. Pressure is exerted on project managers to minimize the chance of project failure. This increasing pressure for performance which suggests that it is prudent for anyone involved in a project to be concerned about the associated risks and how they can be effectively managed. Traditionally, performance of a project is analyzed on the criteria of quality, budget and time of completion.

References

R.H. Abdel-Razek, “How Construction Managers would like their Performance to be evaluated”, Journal of Construction Engineering and Management, ASCE, Vol. 123,No. 3, pp. 208-213, 1997.

A.B. Abdulaziz, Member and H. A. Tawfiq, “ISO 9000 Quality standards in construction”, Journal of management in engineering, 1999.

Alberto and Timur, “Earned value – based performance monitoring of facility construction projects”, Journal of facilities Management, Vol.11, No.1, pp. 69-80, 2013.

S.N. Ali Kamuruzzaman, “Cost performance for building construction projects in Klang Valley”, Faculty of Built environment, University of [email protected], 2010.

AmaniSuliman Bu-Q, “Risk assessment of International construction Projects using the analytic Network Process”, School of natural and applied sciences. East Technical University, 2007.

R.Atkinson, “Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria”, International Journal of Project Management, Vol.17, No.6, pp. 337-342, 1999.

U.S. Bititci, “Measuring your way to profit”, Management Accounting, Vol. 32, Vol. 6, pp.16-24, 2008.

G. Brenda, “The target population”, Sage discussed methods, 1994.

K.S.Cameron and D.A. Whetten, “Organisational Effectiveness: A Comparison of Multiple Models”, 1983.

A. P.C. Chan, D. Scott, and E.W.M. Lam, “Framework of Success Criteria for Design/Build Projects”, Journal of Management in Engineering, ASCE, Vol.18,No.3, pp.120-128, 2002.

D. Cleden, “Managing project uncertainty”, Abingdon Ashgate Publishing Group, 2009.

Downloads

Published

05-11-2017

How to Cite

Prabu, S. S. ., & Krishna, C. (2017). Effects of Risk Management on Project Performance. The Asian Review of Civil Engineering, 6(2), 40–42. https://doi.org/10.51983/tarce-2017.6.2.2236